







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Construction Before & After in Las Vegas, NV
Photos do more than any sales pitch. A finished kitchen tells you how a crew handles cabinet lines and countertop seams. A reworked bath shows whether the waterproofing was done right, because the tile that looks fine on day one can fail silently behind the wall. Below are before-and-after case studies from projects like the ones we take on across Las Vegas, written so you know exactly what changed and why it mattered.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Recent Transformations
Kitchen Remodel: 1990s Oak Cabinets and a Dead-End Galley in Summerlin
Before
After
Before
AfterThe problem: The kitchen worked for 1995 and not for a family of four in 2024. The peninsula cut the room in half, the laminate had swelled around the sink, and there was no landing space beside the range. What we did: We removed the peninsula and one non-load-bearing wall, reframed the opening, and rebuilt the layout around a proper work triangle. New KraftMaid cabinets went in with soft-close hardware, Cambria quartz counters replaced the laminate, and we updated the circuit to handle a modern appliance load. Permits were pulled and the framing inspection passed before drywall went up. The result: One open room, a real prep zone, and counters that won’t blister when someone sets down a hot pan.
Bathroom Remodel: A Henderson Guest Bath With Hidden Water Damage
Before
After
The problem: What looked like cosmetic wear was a shower pan that had been leaking slowly. A flexing floor underfoot and soft grout at the curb are the usual warnings. What we did: We tore out to the studs, replaced the damaged subfloor, and rebuilt the shower with a bonded waterproofing membrane (the Schluter system – the orange sheet material that seals the whole wet area, not just the tile face) instead of the old mortar bed and liner. Fixtures are Kohler, and we added a curbless entry because the homeowners plan to stay in the house long term. The result: A bathroom that’s watertight behind the tile, not just in front of it.
Whole-Home Remodel: Opening a 1970s Ranch Near Downtown Las Vegas


The problem: The house was solid but chopped into small, dark rooms, and the homeowner wanted light and flow without buying new construction. What we did: We replaced the main load-bearing wall with a properly sized beam and posts, verified by an engineer and signed off at inspection, then took out the dropped soffits and vaulted the ceiling. Flooring, trim, doors, and paint all came in as one continuous finished package. The result: An open living-and-kitchen space that reads as a much larger home, built on the original structure.
Kitchen Remodel: A North Las Vegas Fixer Where the Appliances Didn’t Fit


The problem: This was a first-house purchase where every prior owner had added something on top of something else. The range had no hood, the fridge stuck into the walkway, and the counters were pieced together. What we did: We started clean, working from the appliance specs first so the cabinetry fit around real dimensions instead of guesses. Wellborn cabinets, Silestone counters, Moen fixtures, and a ducted range hood were all fitted as a package. The result: A working kitchen with proper ventilation, sized to appliances that fit the room.
Bathroom Remodel: Reusing a Tub Bath With a New Tile Set, Southwest Las Vegas


The problem: The tub was still in good shape, but the surround tile and drain hardware were failing, and the vanity depth made everyday use awkward. What we did: We kept the tub to save the budget for the parts that mattered. That meant new waterproofing behind the surround, a new tile set, Moen fixtures, and a replacement vanity cut to the right depth. The result: A guest bath that looks fully redone without a full teardown. In Las Vegas, we regularly see this layer of work done wrong the first time, where tile gets set straight onto drywall and fails within a few years. Doing it right behind the tile costs more up front and less later.
Want Results Like These?
Every project above came with a written price before any work started and covers 365 days from the completion date. If you’re planning a kitchen, bath, or whole-home remodel here in Las Vegas, call (844) 797-1112 to schedule your free estimate. A live person answers, day or night.
Written by the team at Mason Remodeling Co Las Vegas.
See the difference
Before
After
Before
After
Before
After


